Spread the love

Surat, Gujarat, Feb 24, A 5th PSC (Pre-stressed Concrete) Bridge Completed for Mumbai Ahmedabad Bullet Train Project in Gujarat.

According to a press release issued by National High Speed Rail Corporation Limited (NHSRCL) company here today A 260 m long PSC bridge over National Expressway- 4 near Kosamba, Surat district is completed on 22nd February 2025 for Mumbai-Ahmedabad Bullet Train Project.
The project is crossing over National Expressway- 4 between Delhi & Mumbai (passing through Rajasthan & Gujarat) near Kosamba at Surat district, Gujarat through elevated viaduct.
The bridge features 104 precast segments with four spans of configuration 50m + 80m + 80m + 50m and was built using the Balanced Cantilever Method, which is ideal for larger spans.
The newly completed bridge is located in between Surat and Bharuch Bullet Train stations.
National Expressway-4 is under construction Expressway between Delhi & Mumbai. The construction was meticulously planned to ensure the safety of both vehicles and workers while maintaining uninterrupted traffic flow and minimizing public inconvenience.

Leave a Reply

Your email address will not be published. Required fields are marked *